Short-horizon rollout prediction (T=[1:20]) on TheWell ASM 1.0 (test)
0.0153VRMSEWaveLiT-9.5M
Evaluation Results
| Method | Links | |
|---|---|---|
| WaveLiT-9.5MParameters=9.5M, Training Protocol=FT2026.05 | 0.0153 | |
| WaveLiT-9.5MParameters=9.5M, Training Protocol=PT2026.05 | 0.0158 | |
| WaveLiT-1.2MParameters=1.2M, Training Protocol=FT2026.05 | 0.0221 | |
| WaveLiT-1.2MParameters=1.2M, Training Protocol=PT2026.05 | 0.0239 | |
| WalrusModel=Walrus2026.05 | 0.0345 | |
| DPOT-HModel=DPOT-H2026.05 | 0.035 | |
| Poseidon-LModel=Poseidon-L2026.05 | 0.0785 | |
| MPP-AViT-LModel=MPP-AViT-L2026.05 | 0.0797 |