Manufacturing Cell Formation on Manufacturing Cell Formation Example I
0.1CPLEX Solution Time (s)unit-capacity minimum-cost network flow model
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| unit-capacity minimum-cost network flow modelNumber of parts (K)=5, Total process routes (N)=11, Number of machines (M)=4, Total nodes (2K + 2N)=32, Total arcs (binary variables)=129, Total constraints (3N + 2K)=432024.11 | 0.1 | 0 | 0 |