Job-Shop Scheduling on Stochastic Job-Shop Scheduling Instance 10x20 level 3
1,303.98Average Objective ValueOR-Tools
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| OR-Tools2026.01 | 1,303.98 | 1,355.03 | 0 | |
| UP-AAC2026.01 | 1,334.83 | 1,457.83 | 0.0237 | |
| AC2026.01 | 1,445.08 | 1,516.43 | 0.1082 | |
| MWKR2026.01 | 1,483.29 | 1,575.13 | 0.1375 | |
| MOR2026.01 | 1,489.93 | 1,580.98 | 0.1426 | |
| SPT2026.01 | 1,516.66 | 1,632.05 | 0.1631 | |
| FIFO2026.01 | 1,529.6 | 1,635.01 | 0.173 | |
| LPT2026.01 | 1,584.19 | 1,718.96 | 0.2149 | |
| LOR2026.01 | 1,605.62 | 1,754.25 | 0.2313 | |
| LWKR2026.01 | 1,614.16 | 1,765.32 | 0.2379 |