Congestion management via busbar splitting on goc DC 2000 (1-split)
3.4Time5-hop-NTO
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| 5-hop-NTO2025.10 | 3.4 | 3 | -9.2 | |
| No-SW2025.10 | 5.5 | 6,510 | 0 | |
| Org-NTO2025.10 | 10 | — | — | |
| Reg-GNN-NTO2025.10 | 11.8 | 3,049 | -6.3 | |
| Clf-GNN-NTO2025.10 | 20 | 1,799 | -4.3 |