Automatic Post-Editing on En-Ja Synthetic (test)
42.2BLEULevenshtein Transformer
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| Levenshtein Transformerstrategy=scratch2019.05 | 42.2 | 44.3 | |
| Transformerstrategy=autoregressive, beam size=42019.05 | 41 | 44.9 | |
| Levenshtein Transformerstrategy=zero-shot2019.05 | 39.4 | 47.5 | |
| Original MT System (NMT)strategy=do nothing2019.05 | 37.7 | 48 |