Assembly Scheduling Problem on ASP n=21, w=15
43,596Objective ValueOptimal
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| OptimalHeuristic Framework=Constructive2026.01 | 43,596 | 0 | |
| TIDEHeuristic Framework=Constructive2026.01 | 33,549 | 23.04 | |
| MCTS-AHDHeuristic Framework=Constructive2026.01 | 33,334 | 23.54 | |
| EoHHeuristic Framework=Constructive2026.01 | 32,217 | 26.1 | |
| HSEvoHeuristic Framework=Constructive2026.01 | 30,291 | 30.52 | |
| ReEvoHeuristic Framework=Constructive2026.01 | 29,743 | 31.78 |