Assembly Scheduling Problem on ASP n=15, w=10
3,003Objective ValueOptimal
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| OptimalHeuristic Framework=Constructive2026.01 | 3,003 | 0 | |
| TIDEHeuristic Framework=Constructive2026.01 | 2,812 | 6.36 | |
| MCTS-AHDHeuristic Framework=Constructive2026.01 | 2,801 | 6.73 | |
| ReEvoHeuristic Framework=Constructive2026.01 | 2,781 | 7.39 | |
| HSEvoHeuristic Framework=Constructive2026.01 | 2,747 | 8.52 | |
| EoHHeuristic Framework=Constructive2026.01 | 2,732 | 9.02 |