Assembly Scheduling Problem on ASP n=12, w=7
792Objective ValueOptimal
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| OptimalHeuristic Framework=Constructive2026.01 | 792 | 0 | |
| TIDEHeuristic Framework=Constructive2026.01 | 780 | 1.52 | |
| MCTS-AHDHeuristic Framework=Constructive2026.01 | 777 | 1.89 | |
| EoHHeuristic Framework=Constructive2026.01 | 775 | 2.15 | |
| ReEvoHeuristic Framework=Constructive2026.01 | 767 | 3.16 | |
| HSEvoHeuristic Framework=Constructive2026.01 | 760 | 4.04 |