# A Learning Method with Gap-Aware Generation for Heterogeneous DAG Scheduling

Source: [A Learning Method with Gap-Aware Generation for Heterogeneous DAG Scheduling](<https://www.sota2.com/research/paper/69c36c500636e5bf4afc67bd>)

Collection index: [llms.txt](<https://www.sota2.com/research/llms.txt>)

Data updated: 2026-06-17T05:00:05.807Z

Authors: Ruisong Zhou, Haijun Zou, Li Zhou, Chumin Sun, Zaiwen Wen

Published: 2026-03-24T14:16:08.000Z

## Abstract

Efficient scheduling of directed acyclic graphs (DAGs) is a core problem in large-scale data-intensive computing systems, where query plans, data-processing workloads, and computation graphs consist of dependent tasks competing for limited heterogeneous resource pools. In practice, achieving high-performance execution requires schedulers to adapt across environments with varying resource pools and task types, while generating schedules under tight runtime budgets. We propose WeCAN, an end-to-end reinforcement learning framework for heterogeneous DAG scheduling that addresses task-pool compatibility coefficients and generation-induced optimality gaps. It adopts a two-stage single-pass design: a single forward pass produces task-pool scores and global parameters, followed by a generation map that constructs schedules without repeated network calls. Its weighted cross-attention encoder models task-pool interactions gated by compatibility coefficients, and is size-agnostic to environment fluctuations. Moreover, widely used list-scheduling maps can incur generation-induced optimality gaps from restricted reachability. We introduce an order-space analysis that characterizes the reachable set of generation maps via feasible schedule orders, explains the mechanism behind generation-induced gaps, and yields sufficient conditions for gap elimination. Guided by these conditions, we design a skip-extended realization with an analytically parameterized decreasing skip rule, which enlarges the reachable order set while preserving single-pass efficiency. Experiments on real-world TPC-H query DAGs, resource-intensive workload datasets, and ML-compiler computation graphs demonstrate improved makespan over strong baselines, with inference time comparable to classical heuristics and faster than multi-round neural schedulers.

## Recorded benchmark results

A research result applies to its stated dataset, split, metric and evaluation configuration. Compare like-for-like settings, preserve the metric's unit and direction, and distinguish paper-reported results from independent reproduction. The best result recorded here is not a claim of exhaustive, current global coverage.

- [DAG Scheduling on TPC-H Full Generalization 150 tasks](<https://www.sota2.com/research/sota/dag-scheduling-on-tpc-h-full-generalization-150-tasks.md>): DAG scheduling; TPC-H Full Generalization 150 tasks; Makespan: 24338.

- [DAG Scheduling on TPC-H Full Generalization 200 tasks](<https://www.sota2.com/research/sota/dag-scheduling-on-tpc-h-full-generalization-200-tasks.md>): DAG scheduling; TPC-H Full Generalization 200 tasks; Makespan: 31422.

- [DAG Scheduling on Erdős-Rényi 500 tasks](<https://www.sota2.com/research/sota/dag-scheduling-on-erd-s-r-nyi-500-tasks.md>): DAG scheduling; Erdős-Rényi 500 tasks; Makespan: 10083.

- [DAG Scheduling on Layer Graphs 500 tasks](<https://www.sota2.com/research/sota/dag-scheduling-on-layer-graphs-500-tasks.md>): DAG scheduling; Layer Graphs 500 tasks; Makespan: 10752.

- [DAG Scheduling on Stochastic Block 500 tasks](<https://www.sota2.com/research/sota/dag-scheduling-on-stochastic-block-500-tasks.md>): DAG scheduling; Stochastic Block 500 tasks; Makespan: 10019.

- [Heterogeneous Resource Scheduling on TPC-H 30 (3 pools)](<https://www.sota2.com/research/sota/heterogeneous-resource-scheduling-on-tpc-h-30-3-pools.md>): Heterogeneous Resource Scheduling; TPC-H 30 (3 pools); Makespan: 18964.

- [Heterogeneous Resource Scheduling on TPC-H 50 (3 pools)](<https://www.sota2.com/research/sota/heterogeneous-resource-scheduling-on-tpc-h-50-3-pools.md>): Heterogeneous Resource Scheduling; TPC-H 50 (3 pools); Makespan: 32814.

- [Heterogeneous Resource Scheduling on TPC-H-100 (3 pools)](<https://www.sota2.com/research/sota/heterogeneous-resource-scheduling-on-tpc-h-100-3-pools.md>): Heterogeneous Resource Scheduling; TPC-H-100 (3 pools); Makespan: 61373.

- [Computation graph scheduling on TPC-H heavy 30](<https://www.sota2.com/research/sota/computation-graph-scheduling-on-tpc-h-heavy-30.md>): Computation graph scheduling; TPC-H heavy 30; Makespan: 24099.

- [Computation graph scheduling on TPC-H 50 heavy](<https://www.sota2.com/research/sota/computation-graph-scheduling-on-tpc-h-50-heavy.md>): Computation graph scheduling; TPC-H 50 heavy; Makespan: 35695.

## Original sources and implementation

[Original paper](<https://arxiv.org/abs/2603.23249>)

[PDF](<https://arxiv.org/pdf/2603.23249.pdf>)